Measurement Form
Initial information required for a preliminary quotation. Please share the details below so we can prepare your solar project quotation.
Solar Project Measurement Form
To fill in the Measurement Form, click one of the Google Form links below.
Measurement Form
Technical terms guide
Simple explanations of the terms used in this form, so you can fill it in correctly.
- What is MDB?
- MDB (Main Distribution Board) is the main electrical panel where incoming power is distributed to different loads or sub-panels.
- What is a backup load SDB?
- A backup load SDB (Sub Distribution Board) supplies electricity only to selected essential circuits during a power failure.
- What is sanction load?
- The approved electrical load capacity allowed by the electricity provider for your premises.
- What is connected load?
- The total rated capacity of all electrical equipment connected to the system.
- What is maximum active load?
- The highest actual operating load recorded during running conditions.
- What is average active load?
- The normal average power consumption during regular operation.
- What is hybrid solar?
- A hybrid solar system works with solar panels, an inverter, batteries and the grid or a generator, so it can reduce bills and also provide backup power.
- What is an AI-integrated solar system?
- An AI-integrated solar system uses smart technology to monitor performance, detect faults, predict maintenance needs and optimise energy use automatically.
- Roof purlin and how to measure it
- Measure the clear centre-to-centre distance between two adjacent purlins. Also note the roof height for access, installation and safety planning.
Tip: if you are unsure about any value, leave it blank or share your electricity bill and site photos with OSLEOS for assistance.


